  • Ting said it conveyed the decision to the ABB-CBPO consortium in a letter Wednesday.
  • However, ABB-CBPO was later dropped by Ekran as the main contractor following contractual disputes in September.
  • In July, Ting told reporters that contract language allowing ABB-CBPO to claim cost overruns beyond the project value of 13.6 billion ringgit ( dlrs 4.53 billion ) seemed to favor the consortium.
  • The method of farming out these contracts is required under the conditions of the engineering, procurement and construction contract that was awarded to a group led by Asea Brown Boveri of Germany and CBPO of Brazil, he said.
  • Ekran was awarded the RM15.5 billion project ( revised to RM18 billion after the ringgit depreciation ) and contracted it out to a Swedish-Brazilian consortium comprising Asea Brown Boveri and a Brazilian group, Companhia Brasileira de Projectos Obras ( ABB-CBPO ).
  • Ekran awarded the electromechanical works and the transmission portion to ABB . ABB's consortium partner for the civil works will be Companhia Brasileira de Projetos e Obras ( CBPO ) of Brazil, a large civil engineering company belonging to the Odebrecht Group, responsible for the construction of the dam and power house.
  • CHRONOLOGY OF EVENTS JUNE 19 1996 High Court declares Bakun's EIA process invalid JULY 3 1996 Bakun power purchase agreement signed with Tenaga Nasional Bhd JULY 12 1996 Appeal Court suspends effect of declaration pending appeal OCTOBER 2 1996 EPC contract on dam project signed with Asea Brown Boveri FEBRUARY 5 1997 Ekran Bhd announces SC's approval og listing of Bakun Hydroelectric Corp Bhd FEBRUARY 17 1997 Appeal Court quashes decision of High Court SEPTEMBER 4 1997 Ekran terminates contract with ABB-CBPO NOVEMBER 20 1997 Ministry of Finance Inc takes over implementation of Bakun project from Ekran Copyright 1997 BUSINESS TIMES all rights reserved as distributed by WorldSources Online, Inc.