preheater การใช้
- Numbers 65 014-65 018 were given a mixer preheater.
- The last locomotive, no 129, also received a preheater.
- On August 25, 1840, an air preheater began operating.
- Mercury and its compounds are not precipitated in the kiln and the preheater.
- For this reason, the rawmill is usually placed close to the kiln preheater.
- Thus 35 machines were given a boiler with mixer preheater and turbo feed pumps.
- As a unique example, locomotive No . 129 was fitted with a preheater.
- That is part of the preheater ).
- Regenerative air preheater is not required.
- This is called the air preheater.
- The Class 362 / 363 engines had an electrically-controlled preheater and heat retention system.
- The " Rothemuhle " regenerator is used as an air preheater in some power generating plants.
- The preheater was located in front of the chimney and lay parallel to the axis of the locomotive.
- It is also equipped with an engine preheater, to allow the engine to start in severe cold.
- At a cost of ?0m, the kiln is 68m long and the preheater tower is around 80m high.
- This can choke the preheater to the point that air-flow can no longer be maintained in the kiln.
- This technology has been extensively used in industrial furnaces and powerplants where it is known as an air preheater or APH.
- The system feeds both units terminating on the air preheater roof where the main boiler feeds are controlled through a gas header.
- For example, no feedwater preheater was fitted to start with for weight-saving reasons, but one was later installed.
- As was typical on all " Einheitslokomotiven ", the engine had a Knorr feedwater preheater mounted transversely above the smokebox.
- ตัวอย่างการใช้เพิ่มเติม: 1 2 3